Arabian Al Kanar Group
Al KanarIndustrial Services

Industrial Services · Field-erected cooling towers

Field-erected cooling towers, kept at full performance.

Inspection, maintenance, emergency repairs, rehabilitation and reconstruction for oil and gas, energy and major infrastructure and institutional campuses — by our own engineers and site teams since 2011.

MECHANICAL-DRAFT COOLING TOWERNATURAL DRAFT
  • Since 2011cooling tower services across the Kingdom
  • Design, build, maintainend to end with in-house engineers and technicians
  • Zero injuries since 2011our staff and subcontractors
  • Long-term maintenance contract holderfor SABIC

Results

More cooling from the towers you already have.

15 years
of cooling tower projects across Saudi Arabia
+42%
cooling capacity from an existing concrete tower
+25%
capacity in the same footprint
Zero
unit shutdowns during a tower replacement

Capacity results are project outcomes from individual tower upgrades; results depend on the tower, its duty and operating conditions.

See the projects

Who we serve

Cooling towers across the Kingdom’s critical facilities.

Oil and gas, petrochemical, power and utility operators and large institutional campuses — including Saudi Aramco and SABIC.

  • Oil & gasGas plants, NGL and processing facilities
  • Petrochemicals & chemicalsWorld-scale chemical and petrochemical plants
  • Power & waterPower plants and desalination
  • UniversitiesCampus and IT-centre cooling
  • HealthcareHospitals and medical cities
  • Commercial & publicLarge building cooling plants
  • Client logo
  • Client logo
  • Client logo

Long-term maintenance

Trusted with SABIC’s cooling towers.

Al Kanar holds a long-term maintenance contract with SABIC. The same team, procedures and spares that support that contract are available to every customer — from a single inspection to a multi-year maintenance partnership.

Maintenance contracts

Al Kanar team carrying out maintenance on a cooling tower deck

Turnaround services

A clear process, inside your shutdown window.

  1. Inspect

    Inspect the tower and its mechanical equipment.

  2. Report

    Identify problems and recommend the right fix.

  3. Supply

    Supply spare parts from stock.

  4. Repair

    Repair, service or reconstruct the tower.

  5. Verify & hand over

    Agreed inspections, functional checks or thermal testing, then completion records and recommendations.

Spares ready

Parts on the shelf, not on order.

We hold critical cooling tower spares in our own warehouse, so replacement parts reach site in a short time — even during an unplanned outage.

Equipment & spares

8,200
film-fill blocks in stock
1,000 m²
drift eliminators in stock
800
spray nozzles in stock

From our sites

Work you can see.

Cooling tower fill before cleaningBefore
The same fill after cleaningAfter
Hydro-jet cleaning of fill media
Cooling tower fill before cleaningBefore
The same fill after cleaningAfter
Hydro-jet cleaning of fill media

Project gallery

Plan your next shutdown with us

Tell us about your towers and our team will be in touch.

Contact us